# 建立完美的營造完結清單

> 完結清單是營造專案已完成前需要完成的任務清單。瞭解建立完美完結清單所需的內容。

Source: https://asana.com/resources/punch-list

## 建立完美的營造完結清單

#### 摘要

完結清單是營造專案已完成前需要完成的任務清單。 總承包商及其團隊成員會在完結清單上追蹤待辦事項，以確保他們仔細處理每個項目，從而讓客戶對最終專案感到滿意。 在本文中，我們將討論建立完美營造完結清單所需的內容。Imagine you're nearing the end of a project, but there are still a lot of loose ends you need to tie up before officially completing your work. Keeping track of all those smaller tasks can be a challenge. Instead of scrambling for those  loose ends at the end of a project, try compiling a list of tasks that need to be completed beforehand. Later, you can use that same list to double-check that everything is completed before the final payment is due. 

In the construction industry, this is known as the punch list process.

## What is a construction punch list?

A punch list is a [construction project management](https://asana.com/resources/construction-project-management) tool that lists all the smaller tasks that need to be completed before the overarching construction project can be completed. A punch list is also referred to as a snag list, deficiency list, or punch out list. 

The term originated from an older process in which a construction [project manager](https://asana.com/resources/become-a-project-manager) would physically punch a small hole on a piece of paper to mark a task as complete. 

Here's how a punch list works in action:

A general contractor is doing a walkthrough of a kitchen renovation project. While construction is complete, the team has yet to test any of the appliances, water lines, and electric wiring. The contractor adds all of those tasks to a punch list. After doing a thorough inspection and adding to the list to comply with the contract specifications, the construction project manager [delegates](https://asana.com/resources/how-to-delegate) those individual tasks back out to subcontractors. The project manager then uses the punch list to double check all of the work assigned to subcontractors and ensure everything is completed.
- [建立完結清單範本](/templates/punch-list)

## What information does a construction punch list provide?

A punch list clarifies what needs to be done in order for a specific task to be considered complete. A punch list typically has:
- **Item number or "punch" number:** A numerical indicator for each list item allows team members to clearly communicate which punch list item they're referring to. This is especially important when there are similar tasks that need to be done.
- **Item name:** This is a general name for the task that needs to be done. It's best to start task names with a verb so what needs to be done is clear. For example, "Test the garbage disposal" is a clear task name. 
- **General description:** If the task name doesn’t provide enough information, including more situational context can help your team clearly understand what needs to be done. For example, if something needs to be fixed, what was the mistake in the first place? Providing this information can help your team members find the right solution.
- **Owner or assignee:** This is the person responsible for completing the task. If a [stakeholder](https://asana.com/resources/project-stakeholder) has any questions about a specific task, the owner is responsible for that information.
- **Start date:** When an assignee begins working on a task.
- **End date or due date:**When a task is completed if there is no deadline, or the deadline a task needs to be completed by.
- **Status:** The stage a task is in. Status updates can vary from job site to job site. The most simple statuses are not started, in progress, and completed.

At the end of the day, the information you share on your construction management punch list will vary based on your project management style. The end goal is to provide team members with enough contextual information so they know exactly which tasks they’re responsible for.
- [閱讀：25 個成功所需的專案管理核心技能](/resources/project-management-skills)

## Why use a construction punch list?

Punch lists are a common tool for construction project management, and for good reason. Here are a few reasons why construction project managers still use punch lists today.

### Help your team produce high quality work

When the punch list process is implemented throughout the entire project (not just at the end) the construction project manager has the opportunity to catch any mistakes or issues as they happen. 

Project owners can also use the walkthrough and punch list as an opportunity for quality control. If there's a part of the build that doesn't meet contract specifications or if something wasn’t installed correctly, the project manager can list it on the punch list to rework. 

### Prevent communication errors

Your punch list should be a joint effort between the construction project manager and any subcontractors working on the project. If team members need to find more details on their assigned task, the punch list serves as a reference for more information. When the punch list has [action items](https://asana.com/resources/action-items) and assignees clearly labeled, there's no confusion as to which team member works on what. 
- [閱讀：為什麼清楚的溝通計劃比您想像的更為重要](/resources/communication-plan)

### Clearly track delegated work

If you're working on a larger construction site, it's not unusual to have a long punch list near the end of a project. A project manager can streamline the process by delegating work to specialty contractors or other team members, saving more time in the long run. 

## Best practices for using a punch list

Construction management professionals have been using punch lists for years. Here are a few best practices to use to ensure your construction project runs smoothly.

### Use a punch list consistently throughout the construction process

While a punch list is most commonly used at the end of the construction process, it's best to use this tool throughout the entire duration of your project. Known as a rolling punch list, this practice helps your team minimize the number of items on the final punch list. 

A rolling punch list can also help you achieve what’s called a zero punch list. Zero punch lists happen when the final walkthrough produces zero items on the punch list. Imagine going through the final walkthrough without having to do any additional work. That’s a job well done. 

### Clearly delegate action items to team members and subcontractors

One of the best ways to encourage accountability on your team is to delegate tasks to your team members. It’s easier for project managers to double check work when task owners are clearly identified for each punch list item. If there's ever a question about a certain task, the general contractor will know who is responsible, so they can go to the task owner for clarification.
- [閱讀：如何有成效地委派任務：給經理的 10 個提示](/resources/how-to-delegate)

### Use software to track progress

Traditionally, punch lists were created on paper and coordinated by the construction project manager. But by transforming your punch list using [digital project management software](https://asana.com/uses/project-management) like Asana, you can give your entire team access to all critical construction project information from anywhere on the jobsite. Whether they're using a laptop, tablet, or accessing the punch list on their mobile phone, your team can easily find the task they're responsible for in real-time.

## Align your jobsite with Asana

Sharing punch list information with your team doesn't have to add to the regular everyday stress of a jobsite. Effectively communicate with everyone on your team with work management software like [Asana](https://asana.com/product). With Asana for mobile, you can easily access and update punch list information on the go.

- [專案管理](/resources/project-management)

- [工作細目結構 (WBS)：WBS 是什麼，要如何使用？](/zh-tw/resources/work-breakdown-structure)

專案管理

#### 內容撰稿人

工作分解結構 (Work Breakdown Structure，簡稱 WBS) 是專案管理中最實用的可視化工具之一。當專案範疇複雜、交付項目眾多時，工作細目結構能將整個專案從最高層級逐步分解為可執行的具體任務，確保每項工作都有明確的負責人和完成日期。由於工作細目結構以可視化方式展示，因此可組合使用工作流程管理軟體與專案管理架構來建立。建立方法包括時間軸、 ...

- [制定應變計劃以預防業務風險的 8 個步驟](/zh-tw/resources/contingency-plan)

商業策略

專案規劃

#### 作者

沒有人希望 A 計劃失效，但準備一份強大的 B 計劃是應對任何情況發生的最佳方式。有了可靠的後援計劃，您就可以有效應對非預期事件，並且盡快讓事情重回正軌。應變計劃是一種主動策略，能夠協助您處理事態惡化並確保業務持續進行。在本文中，深入瞭解如何針對非預期事件制定應變計劃，並且制定恢復策略，以確保您的業務維持健康狀態。什麼是業務應變計劃？業務應變計劃是一種策略 ...

- [建立成功變更管理流程的 6 個步驟](/zh-tw/resources/change-management-process)

商業策略

靈感與影響力百寶箱

#### 作者

改變是幫助組織成功的必要元素。隨著企業成長，您不可避免地會需要實施新工具、嘗試新策略，或打入新市場，還有更多改變不勝枚舉。小規模的變更或不會衝擊很多人的變更，很容易實施，但若您需要實施徹底性的組織變革，又該怎麼做呢？若無妥善的規劃，而試圖實施組織變革可能導致混亂、困惑並降低公司的成長速度。您反倒是需要小心推出變革 (在正式變革之前就有制定好的計劃和支援)， ...

- [15 個秘訣助您建立真正有用的待辦清單](/zh-tw/resources/make-better-to-do-lists)

專案管理

#### 作者

Everyone loves checking things off a to-do list, but when done wrong, lists can cause more harm than good. Disorganized lists lead to missed deadlines and unnecessary stress.The g ...

- [Building the perfect construction punch list](/zh-tw/resources/punch-list)