# planwerk

> Turn Asana building projects into print-ready A3 construction schedules for timber builders.

Source: https://asana.com/apps/planwerk

### What is planwerk?

planwerk turns a construction project in Asana into a print-ready construction schedule (Bauzeitenplan) on A3 landscape paper. It reads the tasks, start and end dates, construction phases, milestones and dependencies of your Asana project and draws them as a color-coded timeline, so site managers and clients get one clear plan without keeping a second copy up to date. Dates stay in Asana: planwerk only reads (workspaces, teams, projects, sections, tasks with custom fields and dependencies, and the signed-in user) and never writes anything back. Each company connects its own Asana workspace once with OAuth; plans can be saved as PDF or SVG, and earlier versions are kept in a history. planwerk is built for timber-frame and construction companies and operated by werkbank://digital GmbH.

### How to connect planwerk + Asana?

###### Prerequisites:
- An Asana account in a workspace that has a team with the construction projects and an annual planning board. Each task on that board carries a custom field that marks the construction phase.
- A Google or Microsoft account to sign in to planwerk.
- The planwerk interface is in German. The button names below are given in English; the screenshots show the German interface.

###### Steps:
- Open [https://planwerk.digital/anmelden](https://planwerk.digital/anmelden) and sign in with Google or Microsoft.
- Open "Settings" in the top navigation. In the first card (Access), click the Asana sign-in button and click "Allow" on the Asana consent page. planwerk asks for read permissions only (users, teams, workspaces, projects, tasks, custom fields) and never writes to Asana.
- In Settings, select the Asana workspace and the annual planning board, then click the load button. Select the team with the construction projects, select the custom field that holds the construction phase (it colours the bars), and click the yellow save button.
- Open "Construction projects" in the top navigation and open a project. The construction schedule appears as an A3 landscape preview. Use the time range buttons above the preview to change the period.
- Click the download icon (tooltip "Save as PDF") to download the schedule as an A3 PDF.

To disconnect, click the disconnect button in the Access card in Settings, or remove planwerk in Asana under your profile &amp;gt; Settings &amp;gt; Apps. planwerk then shows a card saying that the Asana connection no longer works, with a button to reconnect.

### Learn more and get support

To learn more about using the planwerk + Asana integration, visit [planwerk](https://planwerk.digital).

If you have questions, feedback, or need support, visit the planwerk support team.

_Asana does not endorse or certify apps built by third-party developers. If you encounter inappropriate content or behavior, please report it_[here](https://form-beta.asana.com/?k=aYbbBJfJdmEBx4UwCxTJ0w&amp;d=15793206719)_. Otherwise, please contact the app developer for support._

### Collaborate effortlessly with Asana

From the small stuff to the big picture, Asana organizes work so teams know what to do, why it matters, and how to get it done. It's free to get started, simple to use, and powerful enough to run your entire business. [Learn more about Asana today.](https://app.asana.com/)

#### Asana 與您使用的工具協同運作

- [開始使用](/create-account)