## 완벽한 건설 펀치 리스트 만들기

#### 요약

펀치 리스트는 건설 프로젝트가 완료된 후 완료되어야 하는 작업 목록입니다. 일반 계약자와 팀원은 펀치 리스트에서 할 일을 추적하여 각 항목을 신중하게 처리하여 고객이 최종 프로젝트에 만족할 수 있도록 합니다. 이 기사에서는 완벽한 건설 펀치 리스트를 작성하기 위해 필요한 사항에 대해 설명합니다.Imagine you're nearing the end of a project, but there are still a lot of loose ends you need to tie up before officially completing your work. Keeping track of all those smaller tasks can be a challenge. Instead of scrambling for those  loose ends at the end of a project, try compiling a list of tasks that need to be completed beforehand. Later, you can use that same list to double-check that everything is completed before the final payment is due. 

In the construction industry, this is known as the punch list process.

## What is a construction punch list?

A punch list is a [construction project management](https://asana.com/resources/construction-project-management) tool that lists all the smaller tasks that need to be completed before the overarching construction project can be completed. A punch list is also referred to as a snag list, deficiency list, or punch out list. 

The term originated from an older process in which a construction [project manager](https://asana.com/resources/become-a-project-manager) would physically punch a small hole on a piece of paper to mark a task as complete. 

Here's how a punch list works in action:

A general contractor is doing a walkthrough of a kitchen renovation project. While construction is complete, the team has yet to test any of the appliances, water lines, and electric wiring. The contractor adds all of those tasks to a punch list. After doing a thorough inspection and adding to the list to comply with the contract specifications, the construction project manager [delegates](https://asana.com/resources/how-to-delegate) those individual tasks back out to subcontractors. The project manager then uses the punch list to double check all of the work assigned to subcontractors and ensure everything is completed.
- [펀치 리스트 템플릿 만들기](/templates/punch-list)

## What information does a construction punch list provide?

A punch list clarifies what needs to be done in order for a specific task to be considered complete. A punch list typically has:
- **Item number or "punch" number:** A numerical indicator for each list item allows team members to clearly communicate which punch list item they're referring to. This is especially important when there are similar tasks that need to be done.
- **Item name:** This is a general name for the task that needs to be done. It's best to start task names with a verb so what needs to be done is clear. For example, "Test the garbage disposal" is a clear task name. 
- **General description:** If the task name doesn’t provide enough information, including more situational context can help your team clearly understand what needs to be done. For example, if something needs to be fixed, what was the mistake in the first place? Providing this information can help your team members find the right solution.
- **Owner or assignee:** This is the person responsible for completing the task. If a [stakeholder](https://asana.com/resources/project-stakeholder) has any questions about a specific task, the owner is responsible for that information.
- **Start date:** When an assignee begins working on a task.
- **End date or due date:**When a task is completed if there is no deadline, or the deadline a task needs to be completed by.
- **Status:** The stage a task is in. Status updates can vary from job site to job site. The most simple statuses are not started, in progress, and completed.

At the end of the day, the information you share on your construction management punch list will vary based on your project management style. The end goal is to provide team members with enough contextual information so they know exactly which tasks they’re responsible for.
- [참고: 성공에 필수적인 25가지 핵심 프로젝트 관리 스킬](/resources/project-management-skills)

## Why use a construction punch list?

Punch lists are a common tool for construction project management, and for good reason. Here are a few reasons why construction project managers still use punch lists today.

### Help your team produce high quality work

When the punch list process is implemented throughout the entire project (not just at the end) the construction project manager has the opportunity to catch any mistakes or issues as they happen. 

Project owners can also use the walkthrough and punch list as an opportunity for quality control. If there's a part of the build that doesn't meet contract specifications or if something wasn’t installed correctly, the project manager can list it on the punch list to rework. 

### Prevent communication errors

Your punch list should be a joint effort between the construction project manager and any subcontractors working on the project. If team members need to find more details on their assigned task, the punch list serves as a reference for more information. When the punch list has [action items](https://asana.com/resources/action-items) and assignees clearly labeled, there's no confusion as to which team member works on what. 
- [필독: 명확한 커뮤니케이션 계획이 생각보다 중요한 이유](/resources/communication-plan)

### Clearly track delegated work

If you're working on a larger construction site, it's not unusual to have a long punch list near the end of a project. A project manager can streamline the process by delegating work to specialty contractors or other team members, saving more time in the long run. 

## Best practices for using a punch list

Construction management professionals have been using punch lists for years. Here are a few best practices to use to ensure your construction project runs smoothly.

### Use a punch list consistently throughout the construction process

While a punch list is most commonly used at the end of the construction process, it's best to use this tool throughout the entire duration of your project. Known as a rolling punch list, this practice helps your team minimize the number of items on the final punch list. 

A rolling punch list can also help you achieve what’s called a zero punch list. Zero punch lists happen when the final walkthrough produces zero items on the punch list. Imagine going through the final walkthrough without having to do any additional work. That’s a job well done. 

### Clearly delegate action items to team members and subcontractors

One of the best ways to encourage accountability on your team is to delegate tasks to your team members. It’s easier for project managers to double check work when task owners are clearly identified for each punch list item. If there's ever a question about a certain task, the general contractor will know who is responsible, so they can go to the task owner for clarification.
- [참고: 업무를 효과적으로 위임하는 방법: 매니저를 위한 10가지 팁](/resources/how-to-delegate)

### Use software to track progress

Traditionally, punch lists were created on paper and coordinated by the construction project manager. But by transforming your punch list using [digital project management software](https://asana.com/uses/project-management) like Asana, you can give your entire team access to all critical construction project information from anywhere on the jobsite. Whether they're using a laptop, tablet, or accessing the punch list on their mobile phone, your team can easily find the task they're responsible for in real-time.

## Align your jobsite with Asana

Sharing punch list information with your team doesn't have to add to the regular everyday stress of a jobsite. Effectively communicate with everyone on your team with work management software like [Asana](https://asana.com/product). With Asana for mobile, you can easily access and update punch list information on the go.

- [프로젝트 관리](/resources/project-management)

- [비즈니스 리스크를 예방하는 비상 대책을 수립하는 8가지 단계](/ko/resources/contingency-plan)

비즈니스 전략

프로젝트 계획

#### 글쓴이

원래의 계획이 실패하길 바라는 사람은 아무도 없습니다. 하지만 확실한 차선책을 마련해 두면 어떤 상황에도 잘 대처할 수 있습니다. 탄탄한 예비 계획을 세우면 예상치 못한 상황에서도 효과적으로 대응하고 최대한 신속하게 원래 계획으로 돌아올 수 있습니다.비상 대책은 부정적인 결과를 초래할 수 있는 상황에서 용이하게 대처하고 ...

- [성공적인 변경 관리 프로세스를 수립하기 위한 6가지 단계](/ko/resources/change-management-process)

비즈니스 전략

영감 및 영향 컬렉션

#### 글쓴이

변경은 조직의 성공에 필수적인 요소입니다. 예를 들어, 조직이 성장함에 따라 새로운 툴을 도입하거나, 새로운 전략을 시도하거나 새로운 시장에 진입해야 하기 마련입니다. 작은 변화나 큰 영향을 미치지 않는 변화는 실행하기 쉽습니다. 하지만 전면적인 조직적 변경 사항을 실행해야 할 때 무엇을 해야 할까요?적절한 계획 없이 ...

- [효과적인 할 일 목록을 작성하기 위한 15가지 팁](/ko/resources/make-better-to-do-lists)

프로젝트 관리

#### 글쓴이

Everyone loves checking things off a to-do list, but when done wrong, lists can cause more harm than good. Disorganized lists lead to missed deadlines and unnecessary stress.The g ...

- [효과적인 프로젝트 킥오프 미팅을 진행하기 위한 10단계](/ko/resources/project-kickoff-meeting)

프로젝트 계획

#### 글쓴이

프로젝트를 성공적으로 시작하려면 많은 노력을 쏟아부어야 합니다. 하지만 프로젝트가 시작되기도 전에 계획에서 벗어난 것처럼 느껴질 때가 많습니다. 프로젝트에 참여하는 팀원과 이해관계자가 저마다 다른 지식을 가지고 있으며, 기대치와 우선순위가 다양하기 때문입니다. 프로젝트를 시작하기 전에 모든 구성원과 보조를 맞출 기회를 ...

- [Building the perfect construction punch list](/ko/resources/punch-list)

프로젝트 관리

프로젝트 관리

- [글쓴이](/author/sarah-laoyan)

Imagine you're nearing the end of a project, but there are still a lot of loose ends you need to tie up before officially completing your work. Keeping track of all those smaller ...